Client: China Railway 23rd Bureau Group (Thailand) Co., Ltd.
Project Type: Load Test Scheme of 32 m Simply Supported Box Beam
Project Location: Ban Mai Subdistrict, Mueang District, Nakhon Ratchasima Province
Project Value: Not specified
Completion Year: 2023
Load Test Scheme of 32 m Simply Supported Box Beam, Project: BANGKOK - NAKHON RATCHASIMA HIGH-SPEED RAILWAY.
The test involves evaluating the load-bearing behavior of the bridge (Trial span segment viaduct) using the Bending test method in accordance with the TB/T 2092-2018 standard. The maximum test load is set at 12,000 kilonewtons. Additionally, a Natural Frequency test will be conducted following the TB/T 10621-2014 standard. This test uses a 1-ton load dropped freely from a height of 1 meter to assess the structural response under load and evaluate the structural load-bearing capacity. The evaluation will be performed using a Mathematical Finite Element Model.
Department/Division: Quality Assurance Business Unit Project Location: Ban Mai Subdistrict, Mueang District, Nakhon Ratchasima Province Project Owner/Contractor: China Railway 23rd Bureau Group (Thailand) Co., Ltd.
For inquiries about quality assurance testing services, contact: Line: @stsgroup Phone: 02-270-8899 Ext. 511 Email: [email protected] Website: www.sts.co.th